How to Install EN 877 SML Pipes and Fittings

Dinsen is one of the fastest-growing companies in China, offering a full range of EN 877 – SML/SMU pipes and fittings. Here, we provide a guide on installing SML horizontal and vertical pipes. For more details, please feel free to contact us. We are here to serve you sincerely.

Horizontal Pipe Installation

  1. Bracket Support: Each 3-meter length of pipe should be supported by 2 brackets. The distance between the fixing brackets should be even and not exceed 2 meters. The length of the pipe between a bracket and a coupling should be no less than 0.10 meters and no more than 0.75 meters.
  2. Pipe Slope: Ensure the installation respects a slight fall of around 1 to 2%, with a minimum of 0.5% (5mm per meter). The bending between two pipes/fittings should not exceed 3°.
  3. Secure Fastening: Horizontal pipes must be securely fastened at all changes of direction and branches. Every 10-15 meters, a special fixing arm should be attached to a bracket to prevent pendular movement of the pipe run.

a7c36f1a

Vertical Pipe Installation

  1. Bracket Support: Vertical pipes should be fastened at a maximum distance of 2 meters. If a storey is 2.5 meters high, then the pipe needs to be fixed twice per storey, allowing for the direct installation of all branches.
  2. Wall Clearance: The vertical pipe should be fixed at least 30mm away from the wall to allow easy maintenance. When the pipe passes through walls, use a special fixing arm and a bracket at the bottom of the pipe.
  3. Downpipe Support: Install a downpipe support at every fifth floor (height 2.5 meters) or 15 meters. We recommend fixing it on the first floor.

For more detailed information or assistance with your specific installation, please do not hesitate to contact us.